This past weekend, Josh and I stopped by the house to add a couple drops for
tv's, and look through the framing before insulation and
sheetrock went up...

(HDMI Drop Before Sheetrock in Study)

(HDMI Drop + Techport After Sheetrock in Study)
About the middle of the week insulation was installed,
sheetrock was delivered, and pallets of brick showed up...

(Insulation Installation)
Today they started bricking the house, finished the sheetrock, and taped/floated everything. It's really starting to come together, and since sheetrock is finished we should be about 45 days from closing!

(Living Room Sheetrocked)

(Back Porch Half Bricked)
(Sunset on Thursday)